Construction pics continued!
First pic shows the hole for the drain.
Second pic shows the drain fitting inside with O ring installed, just need to tighten it up.
Third pic shows the inside fitting penetrating the bucket.
Forth pic shows the ball valve installed, as I mentioned earlier there is an O ring on the outside as well.
Fifth pic shows the three inside fittings installed.
Sixth pic shows the air stone and the bucket is complete inside.
Seventh pic shows (my dogs nose, she is very nosy) the outside, and the bucket is complete outside!!!!
Last edited by Them; 09-16-2009 at 01:49 AM..
|