View Single Post
Old 11-01-2002, 07:19 PM   #6
Him--
Jr. Gardener
 
Him--'s Avatar
 
Join Date: Oct 2002
Location: Maude's Domain
Posts: 452
Thanks: 0
Thanked 6 Times in 3 Posts
Him-- is starting to vegetate.
3 Minutes later, that is...

Next we're going to drill drainage holes. These will go directly over the reservoir tub and drain into the tub. We had originally intended to have a drainage system - it couldn't keep up with the pump. These are 2 inch holes cut with a hole saw. Cut them all the way through - the picture only shows the first layer being cut away.
Attached Thumbnails
aeroponic-system-plans-pvc-tubs-3-drillingdrain.jpg  
Him-- is offline