View Single Post
Old 05-12-2007, 11:23 PM   #13
fotoguy
Banned
 
Join Date: Apr 2007
Posts: 136
Thanks: 112
Thanked 29 Times in 21 Posts
fotoguy has blossomed.fotoguy has blossomed.fotoguy has blossomed.fotoguy has blossomed.fotoguy has blossomed.
Thumbs up

Quote:
Originally Posted by DLA View Post
Well after yesterdays rebuild on all the drains today I decided to change the feed lines.

It used to be just one long run with ports to each bucket. That setup meant the last bucket would get feed about 2-3 seconds from anything added to the controller res.

Well I decided to bridge the feed line from mid point of the feed from the controller , I ran 2 new lines and deleted the old. Now the last buckets are not really last anymore, they are timed with the rest now.

I installed the sub-floor, added the airstones and float valves and new double res.

A pic...


That is so AWESOME! You've undoubtedly also inspired hundreds of others to build a system of their own, hoping to get it a
t least near as good as yours. Thanks for sharing this awesome setup.
fotoguy is offline